2012-07-10


  Our research from your needs, this is not just a slogan, it is our company for many years in Zhengzhou has been the practice of the promise, how to produce the products for customers, how to save more cost for customers, has been the highest goal that we pursue in the central plains.

  2006 National Ministry of Construction promulgated the "existing building curtain wall safety maintenance management approach," the third clearly stated: "both the safety of building curtain wall maintenance, the implementation of the owners responsibility system." Article eight of which also provides that: "building to a single owner all, the owners for the safety of the building curtain wall maintenance responsibility; buildings for a number of owners of common all, the owners should be determined in consultation common a security maintenance responsibility, to take the lead in building curtain wall of security maintenance."

  May 18, 2011 at 12:50, Lujiazui Shanghai era World Financial Centre outside the glass suddenly fall, more than 50 cars downstairs, the car hit the glass rain attack, the loss. It is understood that the incident before the property staff found that a building of about 4 square meters of building 46 square meters of wall glass is a problem, then contact the relevant personnel to come to change, and unexpectedly in the replacement of accidents. At that time, the glass shattered in the process of falling ice, hail a hit in the downstairs on the vehicle, resulting in more than 50 vehicles damaged. It is understood that three or four months ago, the building had been similar to the glass smashed the situation, there are many vehicles damaged, but fortunately no injuries. Coincidentally, the day of Shanghai city also occurred in the other two glass curtain wall off event. Day 13 when Xu, Zhao Yan An Xi Road of road a high-rise residential building, 12th floor, also smashing the glass fall, a huge broken sound, sidewalk strewn across the numerous fragments of glass. In addition, 17 am, North Shaanxi Road (near Yan'an Road at the Cohen International Center building also occurred in the crash of 'glass walls, two vehicles passing vehicles smashed, body paint damage. In December 2011 12 Beijing gogo new generation on the west side of the building five layer sightseeing elevator wall a piece of tempered glass suddenly fall, several pedestrians and street vendors head and hand injuries. In order to prevent anyone injured, building near the Fengtai District Puhuangyu subway station B temporary sealing. In July 8, 2008, Hangzhou, a 19 year old girl who was passing by a building was hit by a falling glass of glass, and eventually had to face the fate of being an amputation. August 16th, Nanjing, the sky is the window of a glass drop. This is 4 days in the same building occurred in second cases of glass curtain wall fall accident. A car park ground into pieces, leaving a shocking hole in the windshield.

  The glass curtain wall can be divided into the hidden frame curtain wall and frame curtain wall, which is mainly composed of aluminum, glass, sealant assembly, in accordance with the relevant provisions of the state, aluminum can provide 25 years of quality assurance, in the glass without external blow under the condition, also can ensure the service life of 25 years, according to GB16776 the provisions of our country, sealant can provide 10 years of quality assurance, sealant as the connection of glass and aluminum profiles, an important component of the glass and the glass, the sealing colloid protection for 10 years in accordance with the short board effect, hollow glass can only provide warranty time 10 year warranty, if the sealant is unable to provide 25 years warranty, so the building curtain wall provide 25 year warranty is very doubtful, along with the rapid development of China's economy, as the world's first curtain wall has state, sealant has become one of China's curtain wall development short board.

  Spend tens of millions or even billions only provide ten years warranty of the curtain wall, is not acceptable for all owners, because of the glass curtain wall need to spend more money, the most high class customers, such as the five Stars Hotel, large landmark public buildings, high-grade office, they have a common characteristic is the crowd high level, high density, if the phenomenon of drop curtain wall in these areas, the loss is difficult to estimate, in September 22, 2008 the "rain Porsche": Yuzhong times platinum building 27 floor households glass doors and windows off, will be injured in the 4S shop downstairs Park 7 cars Porsche car, the loss caused by up to 43 yuan. And along with the continuous acceleration of urbanization process, the air quality has been falling, the glass curtain wall is in the environment, further damage to the service life of the curtain wall, and hanging in the glass curtain wall is like a time bomb.

  According to the 2006 National Ministry of Construction promulgated the "existing building curtain wall safety maintenance management approach", the relevant accident should be fully responsible for the owners, and our country is less than the curtain wall, generally no special requirements of the curtain wall is two years. Warranty period of material quality or construction problems, the construction side is responsible for free maintenance replacement, if there is a man-made damage, the construction side is responsible for the maintenance, the cost is responsible for the damage. Once a security incident to the owners to share the risks associated with it?

  According to relevant laws and regulations, if there is a glass curtain wall falling injury incident, the owners can reduce the loss by the following ways: first, in accordance with the provisions of the curtain wall, curtain wall construction in two years, bear the curtain wall damage caused by all the damage. Second, according to the specific reasons for the shedding of curtain wall, if in ten years (sealing colloid warranty period of ten years), according to the specific reasons for the pursue the relevant manufacturer responsibility. Third, the owners of the curtain wall security to buy high policy. Fourth, the curtain wall construction, the selection of quality products. The first second cases only apply to building curtain wall to complete 10In the case of the year, third for the owners, but also bear the high cost of insurance, and therefore the fourth methods for the owners of the most economic.

  Zhengzhou Zhongyuan applied technology research and Development Co., after many years of accumulated technology, and access to the relevant technical standards at home and abroad in various countries and regions, after ten years of development our company has finally successfully developed in compliance with ETAG002 European standard structure adhesive and sealant, so that my company production of a new generation of structural adhesive and the sealant warranty period of 25 years, the Zhengzhou Zhongyuan company became the first company to pass the test of European standard sealant manufacturers, and has been widely used in Shenzhen Securities Building, more days in Yantai Bay, by extending the life of the curtain wall saved 120% of the cost for the customer, and provide a full range of security guarantees, the owners hanging up to practical experience, a new generation of structural adhesive, sealant, it not only reflects our central strength of technology companies, it is our practice of "need" our study from your promise!!!